Our Home Renovation – Part Two: Plumbing
After Dave replaced the old wall joists and raised our ceilings to 7.5 feet, he started on the tedious task of putting in plumbing lines and electrical (more outlets than I have seen in nearly 20 years)!
As there was never any plumbing on our second floor, he had to run lines from there, through the first floor and into our cellar (a hand-dug stone foundation with the original dirt floor).
All the lines made me feel like I was in the land of the red, white, and blue Pex. Check out the photos below, and have a great evening!
Blessings,
Lorraine




